This was a "gut job" of the downstairs.

Kitchen 5a for Blue Ribbon Construction and Consulting by George Hester

Kitchen 5a

A cedar 4x12 mantle was replaced with this simpler,
yet trimmed out unit. The painted desk area was
added, and all the stained paneling was painted
to brighten the space. The stained oak kitchen
replaced the 70's vintage galley kitchen. Two walls
were removed to allow for interaction between
the kitchen and the family room. As nice as this
turned out, I got the highest praise from the mother
of three small boys for moving the laundry room
upstairs where the boys' rooms were. It took a lot
of convincing on my part, but when it was all done,
she was very happy with the results.

Kitchen 5b for Blue Ribbon Construction and Consulting by George Hester

Kitchen 5b

Lots of storage below and above with cabinets to
the ceiling. Column with light switches marked the
corner of the two walls that came out to create
openness.

Kitchen 5c for Blue Ribbon Construction and Consulting by George Hester

Kitchen 5c

Looking back towards diningroom through widened
door opening. Note custom wildflower tiles made
by a friend of mine in the backsplash behind the
range. More of these cannot be seen on opposite wall.

Kitchen 5d for Blue Ribbon Construction and Consulting by George Hester

Kitchen 5d

Counter with matte white tiles and oak trim with
eased corner to reduce hip injuries.

Home

Sitemap

Kitchens

Bathrooms

Home Construction

Decks & Outdoor Construction

Outdoor Room Additions

Other Construction

All content and images copyright Blue Ribbon Construction and Consulting.
www.BlueRibbonConstruction.org
979-779-8113